Fort Bragg, CA
Home MenuDocuments
- Permits/Applications/Brochures
- General Plan/Zoning
- Long Range Planning
- Housing
- CDBG Program
- City Projects
NOE_for_Laboneatory
LTP 14-24 Lions Club Carnival
NOE Signed
NOFA CDP 1-24 UP 1-24, DR 1-24 620
Site Map Example
04102024 Agenda
03272024 Agenda
03262024 agenda
Final LTP 9-24
Final LTP 8-23
Final 06-24 LTP
Notice of Cancellation
Public Hearing Notice ILUDC 6-23
Public Hearing Notice ILUDC 3-23
12132023 pc agenda
NOFA 20231118
Notice of Intent to Adopt MND 20231103
MUP 3-23
VAR 23-3
LPT 27-2023 Magic Market Permit
1 Permit LTP 23-2023 Revised X Country Turkey Trot
Quarterly Downtown Merchant Meeting
ZON-1-23 Public Hearing Notice
UP-1-23 Public Hearing Notice
ADU - Public Hearing Notice 9-13-2023
Press Release - CBD Parking Study Workshop
Revised - RFP Mill Pond EIR
NOFA CDP-2-22
Final EIR: Part III
Final EIR: Part II
Final EIR: Part I
Appendix H
Appendix G
Appendix F
Appendix E
Appendix D
Appendix C
Appendix B
Appendix A
4.0: Mitigation Monitoring and Reporting Program
3.0: Revisions
2.0: Comments and Responses
1.0: Introduction
0.2: Executive Summary
0.1: Table of Contents
0.0: Cover
06052023 Grocery Outlet Notice of Hearing
Sign Permit Application
Draft EIR - Complete
05102023 Grocery Outlet Notice of Hearing
GO Cover Page and Table of Contents
GO - Appendix E
2.0 part 4
2.0 part 3
2.0 part 2
2.0 part 1
4/20/2023 Press Release - Grocery Outlet Planning Commission Meeting Update
DRAFT EIR
Final EIR: Revisions
Utility Assistance Program Application - Spanish
Utility Assistance Program Application - English
Final EIR: Appendix D
Final EIR: Appendix C
Final EIR: Appendix B
Final EIR: Appendix A
Final EIR: Mitigation Monitoring and Reporting Program
Final EIR: Revisions
Final EIR: Comment on Draft EIR and Responses - Part 3
Final EIR: Comment on Draft EIR and Responses - Part 2
Final EIR: Comment on Draft EIR and Responses - Part 1
Final EIR: Introduction
Final EIR: Cover Page
FLIER Shred Event 2023
Pre-Application Worksheet
Address Listing Request Form
Planos y Deseno Gratis Para 2do Unidades
City Facility Use Application
Permiso de Tiempo Limitado - Eventos Especiales
Tiny Homes Brochure
Resources List
09152022-ISMND- Transfer Station -CoFB
Grocery Outlet Public DEIR w Appendices_September 2022
Fort Bragg Grocery Outlet IS
Draft ND Cannabis Ordinance for recirculation
ISMND_03.24.22_DOC
Draft Initial Study for Cannabis Ordinances
02-28-2022 PH Notice - Grocery Outlet vacate permit
Avalon Hotel Initial Study
Grocery Outlet Initial Study
Zoning Map
Clean Complete Elements 1-7
Bainbridge Park Enhancement Project
Phase II - Full Park Enhancement Project
The Bainbridge Park Enhancement Project includes various new amenities as well as rehabilitation of existing features using the $2M State Park Program funding the City was awarded in 2023. In accordance with the grant scope, design amenities of the Park Enhancement Project include:
- The construction of a new multi-use pavilion
- Construction of two 50' x 80' fenced, artificial surface soccer pitch with lights
- New public art and landscaping throughout park
- Master lighting control system and new lights
- Poured ADA surfacing for the 11,000sf playground area
- Camera System for park
- Minor cosmetic and maintenance upgrades to existing bathroom facilities
- Incorporation of existing drainage into the park layout
At its regular meeting on September 11th, 2023 Fort Bragg City Council awarded the contract for design services to Melton Design Group.
On January 10, 2024, the City and Melton Design Group hosted a public meeting seeking input for the project design.
View the Presentation from the public meeting by clicking on the image below
Phase I
Playground Construction
The Wiggly Giggly Playground Equipment has been purchased and a contract awarded to Akeff Construction. The Playground area of the park is currently under construction. Sign up for progress updates on the City’s enotification page: http://www.city.fortbragg.com/about-us/enotification
20 Year Old Playground Being Replaced - Sneak Peak at the New Look Below
The current Equipment at Wiggly Giggly was installed in April 2004. The playground is almost 20 years old and it's replacement has arrived on the coast. We are so Excited to have the new playground built and in service for the children of our coastal community. Notifications, Press Releases, and Social Media posts will be created and distributed to keep you up-to-date on the progress.
Bainbridge Park Master Plan [2016]
The Bainbridge Park Master Plan was completed by City staff in 2016. The plan incorporated several iterations of public engagement and input prior to final acceptance by City Council. The full text of the plan is located here: Bainbridge Park Master Plan.