Fort Bragg, CA
Home MenuDocuments
Impact Fee Nexus Study
2011 Alley Master Plan
Attachment 1 - Bainbridge Park Master Plan
Consultant List Mendocino County
Waste Water Treatment Facility Study 2007
Public Facilities Master Plan 2007
Raw Water Line - Final ISMND
Project Practicality Report
Initial Study / Mitigated Negative Declaration
Existing Conditions and Constraints
Segment 2 Slope Creep - Final Geotech Memo
Raw Water Line - Final Geotech Report
2004 Storm Drain Master Plan
2021 Cure-in-Place Pipe (CIPP) Project
1986 Water System Study and Master Plan
2008 Water and Wastewater Rate Analysis
2019 Sanitary Sewer System Management Plan
City Standard Specifications and Standard Plans
Bainbridge Park Enhancement Project
Phase II - Full Park Enhancement Project
The Bainbridge Park Enhancement Project includes various new amenities as well as rehabilitation of existing features using the $2M State Park Program funding the City was awarded in 2023. In accordance with the grant scope, design amenities of the Park Enhancement Project include:
- The construction of a new multi-use pavilion
- Construction of two 50' x 80' fenced, artificial surface soccer pitch with lights
- New public art and landscaping throughout park
- Master lighting control system and new lights
- Poured ADA surfacing for the 11,000sf playground area
- Camera System for park
- Minor cosmetic and maintenance upgrades to existing bathroom facilities
- Incorporation of existing drainage into the park layout
At its regular meeting on September 11th, 2023 Fort Bragg City Council awarded the contract for design services to Melton Design Group.
On January 10, 2024, the City and Melton Design Group hosted a public meeting seeking input for the project design.
View the Presentation from the public meeting by clicking on the image below
Phase I
Playground Construction
The Wiggly Giggly Playground Equipment has been purchased and a contract awarded to Akeff Construction. The Playground area of the park is currently under construction. Sign up for progress updates on the City’s enotification page: http://www.city.fortbragg.com/about-us/enotification
20 Year Old Playground Being Replaced - Sneak Peak at the New Look Below
The current Equipment at Wiggly Giggly was installed in April 2004. The playground is almost 20 years old and it's replacement has arrived on the coast. We are so Excited to have the new playground built and in service for the children of our coastal community. Notifications, Press Releases, and Social Media posts will be created and distributed to keep you up-to-date on the progress.